Thursday, April 4, 2013
Living Room Update
Just a quick preview of what is going on with the living room. Replaced the glass and cleaned up the frame for the ceiling light. Still not much light but it looks much better than when I started. Three walls are a tan/tea color with one wall chocolate brown for contrast. We should be installing flooring this weekend.
Tuesday, April 2, 2013
New Tool Addition
Needed a little something to help with cutting the flooring. This little baby fits the bill nicely. While it would be way to small for large projects it is well suited for our needs. $149 at Lowes. So far so good. No complaints other than a bit of a pain to put together.
Monday, April 1, 2013
Revised Punch List April 1
Living Room
- Install Cafe Doors
- Install Kick-Plate on Front Door
Touch Up Paint etc.Paint Storm Door, Screen Frame and Windows BlackSpackle and Paint Nail HolesInstall Laminate FlooringInstall Wood Floor Trim (prime/and painted white)Room Transition Trim to BedroomTear up Old FlooringPaint Kitchen Doorway Trim WhiteInstall Thermostat Wiring and RacewayReplace Receptacles and CoversFix Front Door Trim
Trim Closet- Install Closet Door Curtain
Touch Up Paint, etc.- Door Trim
Replace Attic Access PanelSpackle and Paint Nail HolesRoom Transition Trim to BathroomCut Door To FitInstall Laminate FlooringInstall Wood Floor Trim (prime/and painted white)Install Bedroom DoorInstall Electric Baseboard HeaterDrywall Outside CornerInstall Push Light in Closet
Buy and Hang Shower Curtain Rod and CurtainsHang Bathroom Towel Bar, Toilet Paper Holder, etc.Touch Up Paint, etc.Install Hook Latch lock- Partition Screen for Hot Water Tank
Spackle and Paint Nail HolesInstall/Paint wall Laminate around the top of the Surround.Install new Shower Stem and Shower HeadTrim ShowerCaulk TrimCaulk bathtubClean bathtubClean windowDremel old window frame flushFix window sillCaulk windowInstall Bathtub/Shower SurroundTrim Window (After Surround Install)Extend Vent Fan Exhaust to Attic Wall VentTrim FloorInstall Privacy Plastic Panels on WindowInstall / Paint Ceiling Laminate above the Tub/ShowerToilet still has small leakMount Medicine CabinetPaint WindowReplace Tub Spout
Sunday, March 31, 2013
Weekend CountDown
Thursday - Living Room Painted, Bathtub Cleaned
Friday - Plumber fixed Leaking Toilet and Removed old Shower Head Stem. Plumber had to cut open the wall and cutoff the old valve and replace it with a new one. Small Bedroom Primed, 2 Sheets of Paneling Primed, Table Saw Assembled, Started Work on Flooring Bedroom, Fun, Fun, Fun.
Saturday - Replaced Access Panel for the Crawl Space, Moved Wiring for Baseboard Heater in the Main Bedroom, Installed Ceiling Vent Fan and Light in Bathroom, Installed Vanity Light, Installed Light Switches and Outlet, Installed Medicine Cabinet.
Took Easter off on the little house and help my wife with re-installing some trim at our house.
So we didn't get any flooring done or the bathtub/shower surround done, but it was a good weekend all the same. My son Tony came and we spent most of Saturday installing the Ceiling Vent Fan and Light and the rest of the electrical in the bathroom. I goofed on my wiring the outlet and it was causing the breaker to flip. I didn't have time to troubleshoot as my wife and I had dinner plans. We hadn't even made it to the restaurant when my son Tony sent my wife a clip of all the electrical working. Way to go Tony.
Pictures to Soon Follow.
Friday - Plumber fixed Leaking Toilet and Removed old Shower Head Stem. Plumber had to cut open the wall and cutoff the old valve and replace it with a new one. Small Bedroom Primed, 2 Sheets of Paneling Primed, Table Saw Assembled, Started Work on Flooring Bedroom, Fun, Fun, Fun.
Saturday - Replaced Access Panel for the Crawl Space, Moved Wiring for Baseboard Heater in the Main Bedroom, Installed Ceiling Vent Fan and Light in Bathroom, Installed Vanity Light, Installed Light Switches and Outlet, Installed Medicine Cabinet.
Took Easter off on the little house and help my wife with re-installing some trim at our house.
So we didn't get any flooring done or the bathtub/shower surround done, but it was a good weekend all the same. My son Tony came and we spent most of Saturday installing the Ceiling Vent Fan and Light and the rest of the electrical in the bathroom. I goofed on my wiring the outlet and it was causing the breaker to flip. I didn't have time to troubleshoot as my wife and I had dinner plans. We hadn't even made it to the restaurant when my son Tony sent my wife a clip of all the electrical working. Way to go Tony.
Pictures to Soon Follow.
Thursday, March 28, 2013
This Weekend Goals

And as if that was not enough lets add Living Room Painted, Floored and Trimmed. Oh wait there's more -- The main bedroom still needs flooring, trim and the electric baseboard heater moved.
Gee that's not too much to ask is it......I can only dream.
Wednesday, March 27, 2013
Fixing a Crooked Light Switch Wall Plate
The house is a wreck and there is just way too much left to do. My hope is that we can have the bathroom, Master Bedroom and Living Room done by the first. It will be a busy weekend for sure.
I spent just about the entire night fighting with replacing a crooked duel light switch in the living room. The box was installed crooked and looks like it had been that way since the beginning of time. The old box was metal and there was just no easy way of getting it out. I literally had to take it out in pieces. Luckily I was able to do this without damaging the wall. I had to leave one side of the box as it was somehow wrapped around the stud.
This is the gang box I used. It is made for replacing old boxes. It has two tabbed flaps, one in each corner to secure the box to the wall. I had to re-size the hole a bit so the new box would not be crooked like the original.
In the end I triumphed and had the new box and switches installed before I called it a night. Level and Working.
I spent just about the entire night fighting with replacing a crooked duel light switch in the living room. The box was installed crooked and looks like it had been that way since the beginning of time. The old box was metal and there was just no easy way of getting it out. I literally had to take it out in pieces. Luckily I was able to do this without damaging the wall. I had to leave one side of the box as it was somehow wrapped around the stud.
This is the gang box I used. It is made for replacing old boxes. It has two tabbed flaps, one in each corner to secure the box to the wall. I had to re-size the hole a bit so the new box would not be crooked like the original.
In the end I triumphed and had the new box and switches installed before I called it a night. Level and Working.
Monday, March 25, 2013
Two Week Punch List - Revisited
Well not only can I not blog and remodel at the same time, things just take longer than you expected. So for a reality check I thought I would revisit our fist Two Week Punch List (Wish List) I originally posted in January.
We should be closing soon and the Punch List for the first 2 weeks is starting to look like this.
DONE - Get Utilities Set Up - Water/Sewage/Trash, Electric and Gas.
NOPE -Thing 1 (Storage Shed) - Clean, Replace Latch, Lock, Electric and Lights working
NOPE -Thing 2 (Storage Shed) - Clean, Fix Door, Lock
Living Room
Light Fixed, Ceiling Painted, Walls and Flooring left to do.
Main Bedroom
Closet Ready for Trim, Room Painted, Light Fixed, Sill need to lay floor and trim and install door. -
Youth Bed Room - Ceiling Painted, Old Closet Removed Still a lot of work left to do - Remove Old Closet, Add Closet, Paint, Light, Door
Bathroom - We replaced the Toilet and Flooring and painted the walls but it is still a mess.Seal and Paint Shower Window and Enclosure, Shower Head, Paint, and the Toilet has the never to still leak. Floor, Replace Medicine Chest, Add Light and Switch, Shower Doors
NOPE - Porch - Well we did get the windows closed. fix Screen Door, Close Windows, Remove Mounted Cabinets
Kitchen - Outlet is fixed and we have a small temp refirigerator Oven is Clean but I shorted out the baking element doing the final clean. Refrigerator, Clean Oven, Fix Counter Outlet
Exterior - Got a Lock for the breaker box and sheds but have not had a chance to fix the step. Lock for Electrical Breaker Box, Fix Step
Progress is being made but at a much slower rate than I had anticipated.
We should be closing soon and the Punch List for the first 2 weeks is starting to look like this.
DONE - Get Utilities Set Up - Water/Sewage/Trash, Electric and Gas.
NOPE -Thing 1 (Storage Shed) - Clean, Replace Latch, Lock, Electric and Lights working
NOPE -Thing 2 (Storage Shed) - Clean, Fix Door, Lock
Living Room
Light Fixed, Ceiling Painted, Walls and Flooring left to do.
Main Bedroom
Closet Ready for Trim, Room Painted, Light Fixed, Sill need to lay floor and trim and install door. -
Youth Bed Room - Ceiling Painted, Old Closet Removed Still a lot of work left to do - Remove Old Closet, Add Closet, Paint, Light, Door
Bathroom - We replaced the Toilet and Flooring and painted the walls but it is still a mess.Seal and Paint Shower Window and Enclosure, Shower Head, Paint, and the Toilet has the never to still leak. Floor, Replace Medicine Chest, Add Light and Switch, Shower Doors
NOPE - Porch - Well we did get the windows closed. fix Screen Door, Close Windows, Remove Mounted Cabinets
Kitchen - Outlet is fixed and we have a small temp refirigerator Oven is Clean but I shorted out the baking element doing the final clean. Refrigerator, Clean Oven, Fix Counter Outlet
Exterior - Got a Lock for the breaker box and sheds but have not had a chance to fix the step. Lock for Electrical Breaker Box, Fix Step
Progress is being made but at a much slower rate than I had anticipated.