We should be closing soon and the Punch List for the first 2 weeks is starting to look like this.
Get Utilities Set Up - Water/Sewage/Trash, Electric and Gas.
Thing 1 (Storage Shed) - Clean, Replace Latch, Lock, Electric and Lights working
Thing 2 (Storage Shed) - Clean, Fix Door, Lock
Living Room - Paint, Floor, Fix Light
Main Bed Room - Paint, Floor, Closet, Door, Light
Youth Bed Room - Remove Old Closet, Add Closet, Paint, Light, Door
Bathroom - Seal and Paint Shower Window and Enclosure, Shower Head, Paint, Floor, Replace Medicine Chest, Add Light and Switch, Shower Doors
Porch - Fix Screen Door, Close Windows, Remove Mounted Cabinets
Kitchen - Refrigerator, Clean Oven, Fix Counter Outlet
Exterior - Lock for Electrical Breaker Box, Fix Step
Still researching closet options, build, or replace with bigger wardrobes. Decisions, Decisions, Decisions. The main bedroom has a very small built in closet and the small bed room will not have a closet at all after we make it back into a bedroom. The small bedroom had been converted and used as a walk in closet.
The kitchen which is need of a major remodel will start after all of the above. We are replacing the carpet in the living room with wood laminate and may put it in the main bedroom as well. How well the install goes in the living room will be a major deciding factor on whether we extend it into the bedroom.