Wednesday, March 6, 2013

Moving Operations To the Porch

I spent one day just cleaning up the mess we had made of the back porch. Things were really starting to pile up in there. It had became a catch-all for all our demo work and anything else that was in our way. I bagged up all the lose stuff, took the big stuff to Thing 1 and Thing 2 and cut and rolled up the old carpet and padding for pickup.


Once the porch was cleaned up. I decided it was time to move all the sawing from the Living Room and Kitchen to the Porch. It is obviously much colder but the dust and mess was starting to get out of hand.

The kitchen is the last room scheduled to be done and will not be ready by the scheduled move-in-date of April 1, but it has to be useable.  We hope to have it done by the end of April. The Enclosed Porch doesn't make the list until May

No comments:

Post a Comment